Energy Management Plan
Advantage Nissan
Building ID: KITSAP674
5101 Auto Center Blvd, Bremerton, WA 98312
Plan Adoption Date: 08-07-2026
Last Updated: 08-20-2026
Signed by Building Owner: 10/12/2026
Energy Manager: Chuck Capps
Standard: Washington State Clean Buildings Performance Standard (Tier 2)
Building Summary
5.1An Energy Management Plan has been established and maintained in accordance with the standard.
| Building Information | |
|---|---|
| Site Name | Advantage Nissan |
| Building ID | KITSAP674 |
| Address | 5101 Auto Center Blvd, Bremerton, WA 98312 |
| Construction Year | 2001 |
| Facility Description | Constructed in 2001, the Advantage Nissan building is an automotive new car dealership with centralized natural gas HVAC controls, LED lights and incandescent lighting with localized lighting control. Domestic hot water is supplied from natural gas. In addition, the building has 1 Level 3 (3 phase) high speed EV charger on site along with 4 Level 2 EV chargers. |
| Weekly Operating Hours | Weekly average operating hours is 74.5 hrs/week. Mon-Fri 7:30 AM to 7 PM Saturday 8 AM to 6 PM Sunday 11 AM to 6 PM |
Building Activity Type
Gross floor area by building activity, totaling 21,000 square feet.
| Building Activity | Gross Floor Area (Sq Ft) |
|---|---|
| New Car Showroom / Waiting Area | 3,860 |
| Service Dept / Service Drive | 2,880 |
| Service Repair Shop Area | 6,984 |
| Parts Dept | 1,728 |
| Detail Shop Area | 3,056 |
| Office / Lunchroom / Conference Area | 2,492 |
| Total GFA | 21,000 |
Energy Manager
5.1.1The building owner has designated an energy manager (EM) to develop and maintain an energy management plan for the building.
| Energy Manager's Name | Chuck Capps |
| Association with the Building | Executive Manager |
Energy Accounting
5.1.2.2 WNEUI and EUI from the initial year of compliance for building.
5.1.2.3 Documented annual updates of net energy use, WNEUI and EUI.
5.1.2.4 Documented annual comparison of the net WNEUI and EUI to the energy target.
Our building's net energy is monitored and recorded in accordance with sections 5.1.2.2, 5.1.2.3 and 5.1.2.4.
| Year | Net Energy Use (kBTU/yr) | WNEUI | EUI | EUIt | Difference between WNEUI and EUIt | Difference between EUI and EUIt |
|---|---|---|---|---|---|---|
| 2025 | 1,662,693.5 | 75.9 | 79.2 | 59 | 16.9 | 20.2 |
Metrics Summary
Energy use by calendar month (not weather normalized), electric grid and natural gas. Chart current as of 07/13/2026 2:09 PM PDT; see the signed plan PDF for the full monthly chart.
| Metric | Dec 2024 (Other) | Jun 2026 (Energy Current) | Change |
|---|---|---|---|
| Site EUI (kBtu/ft²) | Not Available | 74.0 | N/A |
| Site Energy Use (kBtu) | Not Available | 1,554,355.4 | N/A |
| Weather Normalized Site EUI (kBtu/ft²) | Not Available | 74.0 | N/A |
Building Changes
5.1.2.5Documentation of original, current, and changes in number of occupants, weekly operating hours, or time of day scheduled for occupancy, production rates, and energy using equipment that would have caused change in the measured WNEUI and EUI.
Baseline Conditions
Gross Floor Area (GFA): 21,000 sq ft
Occupancy: 100% (64 workers)
Weekly Operating Hours: 74.5 hours
| Date of Change | Description of Building Change | Impact of Change |
|---|---|---|
| 2025 | No changes to note for the year | None |
| 2026 | No changes to note for the year | None |
Occupant and Stakeholder Communication
5.1.2.8Method developed to inform occupants about the benefits of efficient energy use and to instruct them in the use and adjustment of operable windows, HVAC system controls, and lighting system components and controls. This shall include materials (electronic or printed) as appropriate.
5.1.3The Energy Manager has provided access to the energy management plan for building occupants and other stakeholders on an annual basis.
| Intended Recipient(s) | Communication | Method | Frequency |
|---|---|---|---|
| All Employees | Energy Saving Tips | Posters hung in break room; emailed to all employees semiannually | Ongoing |
| All Employees | Energy Management Plan | Discussed in monthly all employee meeting; EMP posted in lunch room | Monthly meeting; yearly posting in lunch room or as updated |
Training Plan
5.1.2.9Training plan developed for the O&M personnel to operate the building systems to achieve established indoor environmental targets with optimum energy efficiency.
| Audience | Training | Cadence | Details |
|---|---|---|---|
| HVAC Vendor / Burdik Heating | 30+ years HVAC tech; UTI degree; refrigeration license; electrical license | Annual ongoing training | Annual workshops and conventions covering best practices. Annual training through Trane equipment and Mitsubishi industries. |
| Code Electric | 48 year professional electrician; general electrical license, the top license available to an electrician | Continuing education, 24 hrs every 3 years | 8 hrs a year of continuing education |
Capital Management Plan
5.1.2.10Capital management plan identifies equipment for replacement with energy efficient and ENERGY STAR rated equipment in case of failure.
| Current Equipment | Remaining Useful Life (Years) | Energy Efficient Replacement Option | Budget | ||||
|---|---|---|---|---|---|---|---|
| 2025 | 2026 | 2027 | 2028 | 2029 | |||
| T8, T12 Lighting, Floors 1-2 | 10 | LED retrofit | $20,000 | ||||
| RTU-1, RTU-2 | 8 | (2) 7.5 Ton 125,000 BTU Packaged Units | $25,000 | $25,000 | $25,000 | $25,000 | |
| RTU-3 | 8 | (1) 5 Ton 115,000 BTU | |||||
| Total Budgeted | $25,000 | $25,000 | $25,000 | $45,000 | |||
Contact List
5.1.2.11A contact list of suppliers and manufacturers' local representatives of energy efficient equipment, qualified energy auditor, the Energy Manager, and the building owner.
The contact list for our energy management staff, preferred energy auditors and other contractors, and local suppliers can be found in the tables below.
Energy Management Staff
| Role | Organization | Contact Name | Contact Info |
|---|---|---|---|
| Building Owner | Advantage Nissan | Aaron Capps | 360-373-6300 |
| Energy Manager | Advantage Nissan | Chuck Capps | 360-373-6300 |
Contractors
| Scope of Work | Company | Contact Name | Contact Info |
|---|---|---|---|
| Plumbing | The Sewer Rat | David | 360-731-1448 |
| Mechanical | Advantage Nissan | Chuck Capps | 360-373-6300 |
| Electrical | Code Electric | Buck | 360-509-5743 |
| Elevator | N/A | ||
| Boiler | N/A | ||
| Fire Control Panel | Guardian Security | Customer Service | 206-622-6545 |
| HVAC | Burdik Heating | Brian | 206-730-3197 |
Signature
5.1.4The building owner has reviewed and signed the energy management plan annually.
This plan was prepared by Chuck Capps for Aaron Capps in order to demonstrate compliance with Tier 2 covered building reporting requirements of the Washington State Clean Buildings Performance Standard.
Building Owner / Authorized Representative
Printed Name
Aaron Capps
Date Signed
10/12/2026
The original signed copy is on file and available as a PDF.
View Signed Plan (PDF)Appendix 1
Energy Efficiency Tips for Supporting Sustainability at Advantage Nissan
Small actions today lead to big savings tomorrow.
Turn Off the Lights
Turning off the lights can save up to 10% in energy consumption.
Consider Your Plug Loads
Set computers and devices to enter sleep mode after not being used. Use power strips to provide a master switch to turn off devices at the end of the day.
Manage Your Temperature Set Points
Keep thermostats between 68°F and 78°F. Ensure heat producing equipment is not near your thermostat.
Mind the Windows and Doors
Keep windows and doors closed when the building is being heated or cooled. HVAC systems are most energy efficient when the doors stay closed.
Dress for the Weather
Consider the weather when choosing your outfit. Dress in layers so you can stay comfortable.
Harness Natural Light
Natural light can improve focus, productivity and health.
Get Involved!
We want to hear from you! Have an energy-saving idea or question? Please contact Chuck Capps, Energy Manager, at 360-373-6300 or [email protected].
Email the Energy ManagerThank you for helping us drive efficiency!